/
Launch Success
Liftoff Time (GMT)
12:19:00
Thursday November 11, 1982
Watch Replay
Official Livestream
The first planned Extravehicular activity of program but was canceled due to suit problems.
The shuttle carried a crew of four – the largest spacecraft crew up to that time – and the first two commercial communications satellites to be flown aboard a shuttle. The commercial satellites were deployed successfully and subsequently propelled into their operational geosynchronous orbits by McDonnell Douglas PAM-D kickmotors. The two satellites were SBS 3, owned by Satellite Business Systems, and Anik C3, owned by Telesat Canada; both were Hughes-built HS-376-series satellites. In addition, STS-5 carried a West German-sponsored microgravity GAS experiment canister in the payload bay. The crew also conducted three student-designed experiments during the flight. A planned spacewalk by Lenoir and Allen, the first of the Space Shuttle program, was postponed by one day after Lenoir became ill, and then had to be cancelled when the two spacesuits that were to be used developed problems.
Low Earth Orbit
14,551 kilograms
Agency
NASAPrice
$450.00 million
Rocket
Height: 56.1m
Payload to Orbit
LEO: 27,500 kg
GTO: 3,810 kg
Liftoff Thrust
30,250 Kilonewtons
Stages
2
Strap-ons
2
5th
Mission
3rd
Mission of 1982
116th
Orbital launch attempt