STS-5

Launch Success

Liftoff Time (GMT)

12:19:00

Thursday November 11, 1982

Watch Replay

Official Livestream

Mission Details

Launch Notes

The first planned Extravehicular activity of program but was canceled due to suit problems.

STS-5

Wiki

The shuttle carried a crew of four – the largest spacecraft crew up to that time – and the first two commercial communications satellites to be flown aboard a shuttle. The commercial satellites were deployed successfully and subsequently propelled into their operational geosynchronous orbits by McDonnell Douglas PAM-D kickmotors. The two satellites were SBS 3, owned by Satellite Business Systems, and Anik C3, owned by Telesat Canada; both were Hughes-built HS-376-series satellites. In addition, STS-5 carried a West German-sponsored microgravity GAS experiment canister in the payload bay. The crew also conducted three student-designed experiments during the flight. A planned spacewalk by Lenoir and Allen, the first of the Space Shuttle program, was postponed by one day after Lenoir became ill, and then had to be cancelled when the two spacesuits that were to be used developed problems.

Low Earth Orbit

14,551 kilograms

Rocket

Retired
Space Shuttle Columbia

Active 1981 to 2003

National Aeronautics and Space Administration logo

Agency

NASA

Price

$450.00 million

Rocket

Height: 56.1m

Payload to Orbit

LEO: 27,500 kg

GTO: 3,810 kg

Liftoff Thrust

30,250 Kilonewtons

Stages

2

Strap-ons

2

Launch Site

LC-39A

Kennedy Space Center, Florida, USA

Fastest Turnaround

5 days 6 hours

Stats

Space Shuttle


5th

Mission

3rd

Mission of 1982

1982


116th

Orbital launch attempt