/
Launch Success
Liftoff Time (GMT)
11:33:00
Saturday June 18, 1983
Watch Replay
Official Livestream
The first US woman in space, Sally Ride, and the first deployment and retrieval of a Shuttle Pallet Satellite.
Two communications satellites – Anik C2 for Telesat of Canada, and Palapa B1 for Indonesia – were successfully deployed during the first two days of the mission. The mission also carried the first Shuttle Pallet Satellite, SPAS-1, which was built by the West German aerospace firm Messerschmitt-Bolkow-Blohm. SPAS-1 was unique in that it was designed to operate in the payload bay or be deployed by the Remote Manipulator System (RMS) as a free-flying satellite. It carried 10 experiments to study formation of metal alloys in microgravity, the operation of heat pipes, instruments for remote sensing observations, and a mass spectrometer to identify various gases in the payload bay.
Low Earth Orbit
1 Payload
16,839 kilograms
Agency
NASAPrice
$450.00 million
Rocket
Height: 56.1m
Payload to Orbit
LEO: 27,500 kg
GTO: 3,810 kg
Liftoff Thrust
30,250 Kilonewtons
Stages
2
Strap-ons
2
7th
Mission
2nd
Mission of 1983
60th
Orbital launch attempt