STS-51-B

Launch Success

Liftoff Time (GMT)

16:02:18

Monday April 29, 1985

Watch Replay

Official Livestream

Mission Details

STS-51-B

Wiki

STS-51-B was the second flight of the European Space Agency's Spacelab, and the first with the Spacelab module in a fully operational configuration. Spacelab's capabilities for multi-disciplinary research in microgravity were successfully demonstrated. The gravity gradient attitude of the orbiter proved quite stable, allowing the delicate experiments in materials processing and fluid mechanics to proceed normally. The crew operated around the clock in two 12-hour shifts. Two squirrel monkeys and 24 rats were flown in special cages, the second time American astronauts flew live non-human mammals aboard the shuttle. The crew members in orbit were supported 24 hours a day by a temporary Payload Operations Control Center, located at the Johnson Space Center.

Low Earth Orbit

15,610 kilograms

Rocket

Retired
Space Shuttle Challenger

Active 1983 to 1986

National Aeronautics and Space Administration logo

Agency

NASA

Price

$450.00 million

Rocket

Height: 56.1m

Payload to Orbit

LEO: 27,500 kg

GTO: 3,810 kg

Liftoff Thrust

30,250 Kilonewtons

Stages

2

Strap-ons

2

Launch Site

LC-39A

Kennedy Space Center, Florida, USA

Fastest Turnaround

5 days 6 hours

Stats

Space Shuttle


17th

Mission

3rd

Mission of 1985

1985


35th

Orbital launch attempt