Launch Success

Liftoff Time (GMT)

15:00:00

Wednesday June 1, 1966

Watch Replay

Official Livestream

Mission Details

Launch Notes

First and only launch of the Atlas SLV-3.

Augmented Target Docking Adapter

Wiki

After the failure of the first GATV, NASA commissioned McDonnell to develop a backup docking target minus the Lockheed Agena rocket, the Augmented Target Docking Adapter (ATDA). This consisted of the Gemini docking collar and an attitude control propulsion system based on the Gemini Reentry Control System. The shroud that protected the docking adapter during launch failed to separate, due to lanyards being incorrectly secured with adhesive tape. Gemini 9A was launched on June 3, and when in orbit, the crew observed that the shroud of the ATDA had partially opened and was described by Stafford as "looking like an angry alligator". Docking was not possible, but the rendezvous maneuver was practiced instead.

Low Earth Orbit

1 Payload

794 kilograms

Rocket

Retired
Atlas SLV-3

Active in 1966


Payload to Orbit

LEO: 800 kg

Launch Site

LC-14

Cape Canaveral SFS, Florida, USA

Fastest Turnaround

14 days 23 hours

Stats

Atlas SLV-3


1st

Mission

1st

Mission of 1966

1966


53rd

Orbital launch attempt