STS-59

Launch Success

Liftoff Time (GMT)

11:05:00

Saturday April 9, 1994

Watch Replay

Official Livestream

Mission Details

STS-59

Wiki

Primary payload was the Space Radar Laboratory (SRL-1), located in payload bay; activated by crew and operated by teams on ground. SRL-1 included the Spaceborne Imaging Radar-C and the X-band Synthetic Aperture Radar (SIR-C/X-SAR) and an atmospheric instrument called Measurement of Air Pollution from Satellites (MAPS). The German Space Agency (DARA) and the Italian Space Agency (ASI) provided the X-SAR instrument. SIR-C/X-SAR covered approximately 38.5 million miles of the Earth, the equivalent of 20 percent of the planet. More than 400 sites were imaged, including 19 primary observation sites (supersites) in Brazil, Michigan, North Carolina and Central Europe. Thirteen countries were represented in the project with 49 principal investigators and more than 100 scientists, coordinated by the Jet Propulsion Laboratory (JPL). Some 133 hours of data were collected. The MAPS experiment measured the global distribution of carbon monoxide in the troposphere, or lower atmosphere.

Low Earth Orbit

12,490 kilograms

Rocket

Retired
Space Shuttle Endeavour

Active 1992 to 2011

National Aeronautics and Space Administration logo

Agency

NASA

Price

$450.00 million

Rocket

Height: 56.1m

Payload to Orbit

LEO: 27,500 kg

GTO: 3,810 kg

Liftoff Thrust

30,250 Kilonewtons

Stages

2

Strap-ons

2

Launch Site

LC-39A

Kennedy Space Center, Florida, USA

Fastest Turnaround

5 days 6 hours

Stats

Space Shuttle


62nd

Mission

3rd

Mission of 1994

1994


21st

Orbital launch attempt