Liftoff Time
No Earlier Than 2025
Watch Livestream
24/7 Coverage
Pathfinder Mission 1 or MK1-SN001 is the first of two test missions to validate the technologies needed for its HLS lunar module, some of the life support hardware will travel on this mission in preparation for the first manned flight. MK1-SN001 proves out critical systems, including the BE-7 engine, cryogenic fluid power and propulsions systems, avionics, continuous downlink communications, and precision landing.
Lunar orbit
Agency
Blue OriginRocket
Height: 98m
Payload to Orbit
LEO: 45,000 kg
GTO: 13,000 kg
Liftoff Thrust
17,150 Kilonewtons
Fairing
Diameter: 7m
Height: 21.9m
Stages
2
Cape Canaveral SFS, Florida, USA